Refine Search

Tags and filters

Search results

14 item(s) found Sort by
  1. CNES and ArianeGroup step up cooperation in the launch vehicles sector

    Publishing date:

    September 21, 2017

    On 15 September, CNES and ArianeGroup—the lead contractor for the Ariane family of launch vehicles—signed an agreement to step up their cooperation, innovate more closely together and pave the way for the launchers of the future.

    Associated tags:

  2. Associated tags:

  3. [CHRONIQUE SPATIALE]: Que sont-ils devenus?

    Publishing date:

    August 30, 2021

    Bepi Colombo, Pléiades Neo, MEV-2... Que sont-ils devenus ? A travers cette nouvelle chronique, découvrez les dernières actualités des satellites lancés depuis le CSG à bord de vol Ariane, Vega ou Soyouz.

    Associated tags:

  4. L'assemblage et la mission de l'ATV-2, le cargo de l'ISS

    Publishing date:

    February 10, 2011

    L'assemblage et la mission du cargo ATV-2, le ravitailleur de l'ISS Suite au succès du premier ATV (Automated Transfer Vehicle), Jules Verne, lancé le 9 mars 2008, l’ESA a reconduit sa confiance au CNES pour la conduite des opérations du second ATV, baptisé Johannes Kepler. Celui-ci dispose de davantage de fournitures, de carburant et d’air que le premier. Il sera lancé par Ariane 5 le 15 février prochain.

    Associated tags:

  5. Ariane 5 décolle pour le Japon et les Etats-Unis

    Publishing date:

    July 21, 2020

    Pour son 3e lancement de l’année depuis le Centre spatial guyanais, Ariane 5 emportera 2 satellites de télécommunication et un véhicule permettant de rallonger la durée de vie d’autres satellites.

    Associated tags:

  6. Associated tags:

  7. NEW LAUNCH SUCCESS FOR ARIANE 5- KONNECT (EUTELSAT) AND GSAT-30 (ISRO) IN ORBIT

    Publishing date:

    January 17, 2020

    Thursday 16 January, Ariane 5 completed a flawless launch from the Guiana Space Centre (CSG), Europe’s spaceport in Kourou, orbiting two telecommunications satellites: EUTELSAT KONNECT, built by prime contractor Thales Alenia Space for Eutelsat, and GSAT-30, designed and built by the Indian Space Research Organisation (ISRO). The launch was Ariane 5’s 107th flight, its first mission in 2020 and the first of the year from the CSG. It was also the 251st flight in the Ariane series.

    Associated tags:

  8. [ARIANE 6] New P120C engine successfully tested

    Publishing date:

    July 16, 2018

    The solid-rocket booster for the future Ariane 6 and Vega-C launchers was successfully tested Monday 16 July on CNES’s BEAP solid booster test stand at the Guiana Space Centre.

    Associated tags:

  9. Associated tags:

  10. ELA 4 launch complex takes shape at CSG

    Publishing date:

    October 17, 2017

    The new launch pad for the future Ariane 6 is continuing to take shape in Kourou.

    Associated tags:

  11. ELA 4 is go!

    Publishing date:

    October 17, 2017

    Construction of the Ariane 6 launch pad at the Guiana Space Centre will be completed by mid-March next year.

    Associated tags:

  12. 78th straight success for Ariane 5

    Publishing date:

    May 5, 2017

    Thursday 4 May, Ariane 5 completed a flawless launch from Europe’s spaceport at the Guiana Space Centre (CSG), orbiting two new telecommunications satellites: SGDC, built by VISIONA Tecnologia Espacial S.A. for Brazilian operator Telebras S.A., and KOREASAT-7, built by Thales Alenia Space for Korean operator ktsat, a subsidiary of KT Corp. The flight marked the European launcher’s 78th straight success since 2003, the fourth launch of the year from the CSG and Ariane 5’s second in 2017.

    Associated tags:

  13. Ariane 4 heritage

    Publishing date:

    December 2, 2014

    Space transport - A challenge for Europe

    Associated tags:

  14. Un lanceur, comment ça marche?

    Publishing date:

    January 26, 2010

    L'essentiel sur le fonctionnement de cette machine phénoménale, indispensable pour placer des satellites en orbite.

    Associated tags: